Mechanical, Electrical, Plumbing (MEP)
Why should an AV system be planned alongside the architectural design?
Early coordination of AV and architecture — sightlines, acoustics, ceilings, lighting, cabling, power, networking and maintenance.
An audiovisual system is an integral part of a space. Display visibility depends on the room's shape and furniture, speech intelligibility on acoustics and background noise, and camera images on lighting and participant positions.
AV planning should therefore ideally begin at the architectural concept stage. This allows the conditions required by the technology to be reflected in the building and interior design in good time.
Cisco's intelligent workplace approach likewise involves coordinating networking, power, conferencing technology and building systems before the design is finalised.
First define how the space will be used
Technical decisions should match the room's purpose. A presentation hall, hybrid conference room, teaching room and multipurpose space have different requirements.
At the start of a project, clarify:
- who will use the space and how many people it will accommodate; - where the presenter and audience will be; - whether remote participation, recording or live streaming is planned; - what material will appear on the display; - whether the furniture layout will change.
This information determines the cameras, microphones, displays and connections required. AVIXA's AV design planning material identifies user requirements and system objectives among the initial tasks.
Display size and sightlines
The display position cannot be selected independently of the furniture. Check what people can see from the nearest, farthest and side seats.
A column, lighting element or another participant may obstruct a monitor or projected image. A display positioned too high can also make prolonged viewing uncomfortable.
Selection must consider the content: reading a detailed spreadsheet or technical drawing requires different conditions from watching video.
AVIXA's image size standard is used both to plan new spaces and evaluate existing ones. The relationship between the display and seating should therefore be checked in the drawings.
Acoustics are planned together with interior materials
Glass, stone, concrete and other reflective surfaces affect room acoustics. If a large proportion remains untreated, speech reflections may make conversations harder to follow.
Microphone quality matters, but it does not fully replace suitable room acoustics. Noise from ventilation and adjacent spaces must also be considered.
Shure's audio systems guide for meetings relates speech intelligibility to microphone and loudspeaker positions and the conditions of the space.
Early planning of acoustic treatment makes it easier to incorporate into the interior. Wall panels, ceiling elements and other absorptive surfaces can become part of the architectural composition.
The ceiling is a shared working zone for several systems
Ceilings often accommodate luminaires, ventilation components, loudspeakers, microphones, a projector and other devices.
If their layouts are developed separately, another system may occupy a required position. For example, a decorative element may block a camera's view, while a microphone may end up close to a noise source.
A coordinated ceiling plan should show device positions, mounting heights and the access needed for servicing. Appropriate mounts and support conditions should be agreed at the same stage.
Lighting must also work for the camera
In a hybrid room, lighting serves both the comfort of people present and the camera image.
Overhead lighting alone may create strong facial shadows. A bright window behind a participant creates difficult contrast for the camera.
Microsoft's room planning guidance highlights the relationship between lighting, windows and the camera's view.
Camera position, table orientation, lighting groups and blind control should therefore be considered together.
Cabling and power must be planned before finishes are complete
Appropriate connections are needed between the meeting table, display, camera and equipment rack. Their routes should be coordinated with wall, floor, ceiling and furniture designs.
The design should record connection points, cable pathways, power and the ability to replace cables in future. The requirements of each signal and device must also be considered.
Adding a missing connection in a finished interior may require reopening surfaces or using visible cable trunking. Early coordination reduces the need for these changes.
Equipment racks and maintenance
AV equipment needs space, a suitable operating environment and technical access. When installed in enclosed furniture, heat output, ventilation and cable organisation must be assessed.
It also matters whether a device can be removed or replaced without dismantling the interior.
AVIXA's rack design standard treats rack planning and design as part of the AV project. Its size and location should be determined alongside the system's composition.
Coordinated planning must also appear in the documentation
Decisions by the architect and specialists in AV design, acoustics, electrical systems, networking and ventilation must be coordinated in shared plans.
| Design area | Issue to coordinate |
|---|---|
| Architecture and furniture | Display visibility, camera view and user working positions |
| Ceiling and lighting | Device positions, shadows and service access |
| Electrical systems and networking | Power, ports and cable routes |
| Acoustics and ventilation | Speech intelligibility and background noise |
| Building management | Relationships between lighting, blinds and AV scenarios |
AVIXA's AV documentation requirements consider audiovisual documentation in coordination with architectural, engineering and construction documentation.
How is the final result checked?
Acceptance should test actual use of the space: reading material from every seat, speaking from different positions, camera views and control scenarios.
A hybrid room should also be evaluated from a remote participant's perspective. Access for technical maintenance and operation with the planned furniture layouts are checked too.
This approach brings architectural intent and technology functions together in one result — a space that works clearly and reliably for everyday use.
Sources
- https://www.cisco.com/site/us/en/learn/topics/collaboration/intelligent-workplace-experience.html
- https://www.avixa.org/explore/videos/planning-an-av-design
- https://store.avixa.org/CPBase__item?id=a13f200000C2iQeAAJ
- https://content-files.shure.com/publications/educationalPublications/en/audio-systems-guide-for-meetings-and-conferences.pdf
- https://learn.microsoft.com/en-us/microsoftteams/rooms/room-planning-guidance
- https://www.avixa.org/resources/standards/rack-design-for-audiovisual-systems
- https://store.avixa.org/CPBase__item?id=a13f200000C2iUkAAJ
Project Context
Ready to Apply This in Your Space?
A final engineering solution requires an assessment of your space, intended use and existing infrastructure.
Request a Consultation